NLC Beam Delivery Collimation Page

 
col_rot1_chamber.jpg (27727 bytes)      
 

Purpose of this page:

To collect information relevant to the NLC Beam Delivery Collimation Systems. The content will be updated as necessary. If you have any questions, please contact Eric Doyle or Tom Markiewicz.

Jump to: Performance Requirements section 1.4; Baseline System  section 3.3.

 

NLC Beam Delivery Collimation System

1. Mission/Requirements

1.1 Problem Statement

1.2 Customers

1.3 System Boundaries

System Definitions - Lehman version, Spring '99

1.4 Performance Requirements

Collimators - Lehman version, Spring '99, including all NLC areas

 

2. Functional Analysis

2.1 Generic system descriptions

2.1.1 Overall system

2.1.1.1 Sub-systems

2.2 Operating modes

 

3. System Synthesis/Analysis

3.1 Tradeoff Studies

3.2 Alternatives Analysis

Consumable Collimator R&D

3.2.1 Technical analysis

3.2.2 Cost Analysis

3.3 Baseline System Synthesis

3.3.1 Baseline Technical Description

3.3.2 Baseline Cost

Collimators - Lehman version, Spring '99, including all NLC areas

3.3.3 Baseline Schedule

3.3.4 Baseline Risk

 

4. System Integration/Verification

4.1  Interface Agreements

4.2 Verification Plans

 

Additional Information

 

This page was created 03/16/2000 by Eric Doyle

This page was last updated 08/14/00 12:45 PM